Free Shipping
Free Returns
Easy Payments
Sign up For our Blog
Trade in Welcome
Buy or Lease
Previous
Previous Product Image

M1135 MK II FIXED BOX CAMERA

$415.51
Next

M2036-LE BLACK 4MP BULLET 2.8MM IP66 WDR

$397.01
Next Product Image

M3058-PLVE OUTDOOR 12MP PANO ILLUM VANDAL*CONSTRAINED LONG LEAD

$850.46

AXIS M3058-PLVE 12 Megapixel Indoor/Outdoor Network Camera – Color, Monochrome – Dome – 49.21 ft – H.264, MPEG-4 AVC, MJPEG – 2992 x 2992 Fixed Lens – RGB CMOS – HDMI – Ceiling Mount, Pole Mount, Corner Mount, Pendant Mount, Recessed Mount, Wall Mount, Parapet Mount

SKU: 01178-001 Brand: Axis Communications Condition: New UPC: 7331021061422 Categories: , ,

Description

AXIS M3058-PLVE 12 Megapixel Indoor/Outdoor Network Camera – Color, Monochrome – Dome – 49.21 ft – H.264, MPEG-4 AVC, MJPEG – 2992 x 2992 Fixed Lens – RGB CMOS – HDMI – Ceiling Mount, Pole Mount, Corner Mount, Pendant Mount, Recessed Mount, Wall Mount, Parapet Mount

  • Flat, vandal-resistant indoor/outdoor design
  • Complete 360° overview with outstanding sharpness
  • Forensic WDR, Lightfinder and OptimizedIR
  • Axis Zipstream technology
  • 12 MP senso

Need great performance in any light – or no light at all? AXIS M3058-PLVE Network Camera delivers a complete 180° or 360° overview, indoors or out, around the clock. Plus it features Axis Zipstream technology for reduced bandwidth and storage without sacrificing the forensic detail you need. AXIS M3058-PLVE is perfect for stores, hotels, offices, banks, schools and hospitals. Or anywhere you need a complete overview 24/7.

Here, there, everywhere – anytime

Use AXIS M3058-PLVE indoors or outdoors for a wide variety of purposes anytime of the day or night. Thanks to OptimizedIR and a long list of features that spell, flexible. With the optional black skin cover you can repaint AXIS M3058-PLVE – easily – and it blends in anywhere. And count on the IK10 rating for protection against vandalism and the IP66 rating to keep the camera safe from dust and powerful blasts of water. Which means exposure to the elements is no problem.

You can stream the complete 360° overview. That way you can be sure that you record everything with no blind spots. And the video management software can use that one video stream to produce any dewarped views you’d like. Or you can choose to stream dewarped views such as panorama, quad, corner and corridor views directly from the camera. And you can digitally pan, tilt and zoom in on areas of interest in up to four areas simultaneously.

Sharp to the edges – in any light

AXIS M3058-PLVE is made to deliver sharp images, to the edges, in any light – or no light: OptimizedIR means this camera can “see” in the dark – so there’s no need to turn on the lights at night. It’s equipped with Forensic WDR for visibility when there are both dark and light areas in the same scene. And AXIS M3058-PLVE has Lightfinder technology for life-like colors when the lighting is low.

AXIS M3058-PLVE features a stereographic lens. This lens achieves a higher resolution around the outer portion of the view than in the center, meaning that interesting objects located at a distance in the camera’s peripheral view can be captured more clearly. This is particularly useful when the camera is installed facing downwards.

Sharp images. Low bandwidth

AXIS M3058-PLVE includes Axis Zipstream technology, which analyses the video stream in real time to identify areas of interest. Important details in these areas are preserved in full video quality, while other areas are more compressed, reducing storage and bandwidth by up to 50%. The result is high-quality video and significant savings.

Installation that’s as easy as 1,2,3

Installing and setting up AXIS M3058-PLVE is fast, simple and cost effective. AXIS M3058-PLVE is factory focused and ready to use, right out of the box.

AXIS M3058-PLVE also has I/O ports, so you can connect a sensor or detector to the camera’s digital input to trigger alarms or actions. Output ports can be connected to control devices or relays, for instance, to open/close doors or turn on/off lights upon alarm.

Additional information

Product Type

Network Camera

Product Name

M3058-PLVE Network Camera

Video Formats

H.264

Night Vision Distance

49.21 ft

HD Recording

Yes

Height

2.6"

Diameter

5.9"

Mount Type

Ceiling Mount

Weight (Approximate)

1.70 lb

Remote Management

Yes

NDAA Compliant

Yes

Package Contents

M3058-PLVE Network Camera Installation Guide Windows® Decoder 1-User License Drill Hole Template Cable Gaskets Connector Guard I/O Connector Resistorx® T20 L-Key Mounting Bracket Cable Hole Lid View Protector

Maximum Aperture

f/2.2

Lens Type

Fixed

Marketing Information

Flat, vandal-resistant indoor/outdoor design Complete 360° overview with outstanding sharpness Forensic WDR, Lightfinder and OptimizedIR Axis Zipstream technology 12 MP senso Need great performance in any light – or no light at all? AXIS M3058-PLVE Network Camera delivers a complete 180° or 360° overview, indoors or out, around the clock. Plus it features Axis Zipstream technology for reduced bandwidth and storage without sacrificing the forensic detail you need. AXIS M3058-PLVE is perfect for stores, hotels, offices, banks, schools and hospitals. Or anywhere you need a complete overview 24/7. Here, there, everywhere – anytime Use AXIS M3058-PLVE indoors or outdoors for a wide variety of purposes anytime of the day or night. Thanks to OptimizedIR and a long list of features that spell, flexible. With the optional black skin cover you can repaint AXIS M3058-PLVE – easily – and it blends in anywhere. And count on the IK10 rating for protection against vandalism and the IP66 rating to keep the camera safe from dust and powerful blasts of water. Which means exposure to the elements is no problem. You can stream the complete 360° overview. That way you can be sure that you record everything with no blind spots. And the video management software can use that one video stream to produce any dewarped views you'd like. Or you can choose to stream dewarped views such as panorama, quad, corner and corridor views directly from the camera. And you can digitally pan, tilt and zoom in on areas of interest in up to four areas simultaneously. Sharp to the edges – in any light AXIS M3058-PLVE is made to deliver sharp images, to the edges, in any light – or no light: OptimizedIR means this camera can "see" in the dark – so there's no need to turn on the lights at night. It's equipped with Forensic WDR for visibility when there are both dark and light areas in the same scene. And AXIS M3058-PLVE has Lightfinder technology for life-like colors when the lighting is low. AXIS M3058-PLVE features a stereographic lens. This lens achieves a higher resolution around the outer portion of the view than in the center, meaning that interesting objects located at a distance in the camera's peripheral view can be captured more clearly. This is particularly useful when the camera is installed facing downwards. Sharp images. Low bandwidth AXIS M3058-PLVE includes Axis Zipstream technology, which analyses the video stream in real time to identify areas of interest. Important details in these areas are preserved in full video quality, while other areas are more compressed, reducing storage and bandwidth by up to 50%. The result is high-quality video and significant savings. Installation that's as easy as 1,2,3 Installing and setting up AXIS M3058-PLVE is fast, simple and cost effective. AXIS M3058-PLVE is factory focused and ready to use, right out of the box. AXIS M3058-PLVE also has I/O ports, so you can connect a sensor or detector to the camera's digital input to trigger alarms or actions. Output ports can be connected to control devices or relays, for instance, to open/close doors or turn on/off lights upon alarm.

Product Series

M30

Product Model

M3058-PLVE

Color Supported

Monochrome

Manufacturer

Axis Communications

Manufacturer Website Address

http://www.axis.com

Manufacturer Part Number

01178-001

Effective Camera Resolution

12 Megapixel

Indoor/Outdoor

Indoor/Outdoor

Product Family

M30

Network (RJ-45)

Yes

HDMI

Yes

Image Sensor Type

RGB CMOS

Maximum Focal Length

1.20 mm

Maximum Video Resolution

2992 x 2992

Brand Name

AXIS

Form Factor

Dome

Connectivity Technology

Wired

Maximum Frame Rate

30 fps

Shopping cart

0
image/svg+xml

No products in the cart.

Continue Shopping