Free Shipping
Free Returns
Easy Payments
Sign up For our Blog
Trade in Welcome
Buy or Lease
Previous
Previous Product Image

P3265-LVE 3.4-8.9MM *CONSTRAINED-EXTENDED LEAD TIMES

$693.14
Next

P3715-PLVE (EOL 10/31/22)

$896.73
Next Product Image

M5525-E 1080P PTZ INDOOR/ OUTDOOR *CONSTRAINED LONG LEAD TIME

$970.77

AXIS M5525-E 2.1 Megapixel Indoor/Outdoor Full HD Network Camera – Monochrome, Color – Dome – H.264, MPEG-4 AVC, MJPEG – 1920 x 1080 – 4.70 mm- 47 mm Zoom Lens – 10x Optical – CMOS – Recessed Mount, Surface Mount, Pendant Mount, Wall Mount, Ceiling Mount, Pole Mount, Parapet Mount, Corner Mount

SKU: 01146-001 Brand: Axis Communications Condition: New UPC: 7331021061040 Categories: , ,

Description

AXIS M5525-E 2.1 Megapixel Indoor/Outdoor Full HD Network Camera – Monochrome, Color – Dome – H.264, MPEG-4 AVC, MJPEG – 1920 x 1080 – 4.70 mm- 47 mm Zoom Lens – 10x Optical – CMOS – Recessed Mount, Surface Mount, Pendant Mount, Wall Mount, Ceiling Mount, Pole Mount, Parapet Mount, Corner MountAXIS M5525-E PTZ Network Camera is a compact pan-tilt-zoom camera with HDTV 1080p resolution, 10x optical zoom, and autofocus, enabling great video quality in both overview and detail. Day/night functionality and WDR – Forensic Capture ensures maintained image quality in low or mixed light, and scene profiles are included for automatic optimization. AXIS M5525-E is compatible with any Axis PTZ mount for outdoor installation, but can also be surface-mounted indoors. Protected against dust, rain, snow, and corrosion, the camera operates in temperatures from -20 °C to 50 °C (-4 °F to 122 °F). The microSD card slot enables local video storage

  • HDTV 1080p with 10x optical zoom
  • Continuous 360° for uninterrupted pan
  • WDR – Forensic Capture
  • Axis Zipstream technology
  • I/O ports and two-way audio

Additional information

Product Type

Network Camera

Weight (Approximate)

2.43 lb

Product Series

M50

Marketing Information

AXIS M5525-E PTZ Network Camera is a compact pan-tilt-zoom camera with HDTV 1080p resolution, 10x optical zoom, and autofocus, enabling great video quality in both overview and detail. Day/night functionality and WDR – Forensic Capture ensures maintained image quality in low or mixed light, and scene profiles are included for automatic optimization. AXIS M5525-E is compatible with any Axis PTZ mount for outdoor installation, but can also be surface-mounted indoors. Protected against dust, rain, snow, and corrosion, the camera operates in temperatures from -20 °C to 50 °C (-4 °F to 122 °F). The microSD card slot enables local video storage HDTV 1080p with 10x optical zoom Continuous 360° for uninterrupted pan WDR – Forensic Capture Axis Zipstream technology I/O ports and two-way audio

Lens Type

Zoom

Package Contents

M5525-E PTZ Network Camera Conduit Adapter 3/4" Smoked Dome Adapter Bayonette Installation Guide Windows Decoder 1-User License

NDAA Compliant

Yes

Remote Management

Yes

Mount Type

Parapet Mount

Product Model

M5525-E

Diameter

6.5"

Height

5.2"

Width

6.5"

Recording Formats

Full HD

HD Recording

Yes

Video Formats

MJPEG

Product Name

M5525-E PTZ Network Camera

Manufacturer

Axis Communications

Color Supported

Monochrome

Minimum Focal Length

4.70 mm

Connectivity Technology

Wired

Form Factor

Dome

Optical Zoom

10x

Brand Name

AXIS

Maximum Video Resolution

1920 x 1080

Maximum Focal Length

47 mm

Image Sensor Type

CMOS

Manufacturer Website Address

http://www.axis.com

Network (RJ-45)

Yes

Product Family

M50

Indoor/Outdoor

Indoor/Outdoor

Product Color

White

Effective Camera Resolution

2.1 Megapixel

Manufacturer Part Number

01146-001

Maximum Frame Rate

30 fps

Shopping cart

0
image/svg+xml

No products in the cart.

Continue Shopping