Free Shipping
Free Returns
Easy Payments
Sign up For our Blog
Trade in Welcome
Buy or Lease
Previous
Previous Product Image

P1264 720P PINHOLE (EOL 12/31/22)

$295.21
Next

S1148 24TB

$8,512.96
Next Product Image

P1455-LE-3 LICS PLATE VERIFIER KIT *CONSTRAINED-LONG LEAD TIMES

$1,192.87

AXIS P1455-LE-3 2 Megapixel Outdoor HD Network Camera – Dome – TAA Compliant – 147.64 ft Night Vision – H.264 (MPEG-4 Part 10/AVC), H.265 (MPEG-H Part 2/HEVC), MJPEG, H.264, H.265 – 1920 x 1080 – 10.90 mm Varifocal Lens – 2.6x Optical – RGB CMOS – Pole Mount, Conduit Mount, Corner Mount

SKU: 02235-001 Brand: Axis Communications Condition: New UPC: 7331021075160 Categories: , ,

Description

AXIS P1455-LE-3 2 Megapixel Outdoor HD Network Camera – Dome – TAA Compliant – 147.64 ft Night Vision – H.264 (MPEG-4 Part 10/AVC), H.265 (MPEG-H Part 2/HEVC), MJPEG, H.264, H.265 – 1920 x 1080 – 10.90 mm Varifocal Lens – 2.6x Optical – RGB CMOS – Pole Mount, Conduit Mount, Corner MountAXIS P1455-LE-3 includes an HDTV 1080p fixed bullet camera and comes with AXIS License Plate Verifier preinstalled. Featuring freeflow mode, it’s ideal for use in slow-speed traffic, such as in city centers, gated communities, and campuses. The compact and robust IK10-rated camera includes shock detection for installation in all environments. Featuring a 29 mm telephoto lens, this cost-effective solution can read license plates from 7 to 20 meters (20-65 feet). It includes Axis image enhancement technologies as well as Optimized IR – to ensure sharp images for license plate reading 24/7. Furthermore, it offers tight integration with AXIS Camera Station.

This all-in-one, outdoor camera kit includes an HDTV 1080p fixed bullet camera and comes with AXIS License Plate Verifier preinstalled. It offers an easy, cost-effective kit and includes freeflow mode for slow-speed traffic areas.

All-in-one license plate reading

AXIS P1455-LE-3 License Plate Verifier kit is ideal for slow-speed traffic, such as in city centers, access roads, gated communities, and campuses. It consists of an Axis fixed bullet camera and preinstalled AXIS License Plate Verifier analytics. Featuring a 29 mm telephoto lens, it delivers a high pixel density to allow for sharp license plates reading from 7 to 20 meters (20-65 feet). This cost-effective solution delivers HDTV 1080p resolution and features automatic focus setting to ensure the desired field of view in perfect focus.

Any weather, any time

This robust and compact IK10-rated camera can be installed in all environments. It includes a weathershield and can handle temperatures ranging from -40 °C to 60 °C (-40 °F to 140 °F). Featuring shock detection, the camera will send an alarm when it has been hit. And, electronic image stabilization (EIS) ensures stable video despite vibration. This all-in-one, outdoor camera kit includes Axis image enhancement technologies as well as OptimizedIR to ensure sharp images for license plate reading around the clock.

Easy and efficient

This flexible, all-in-one solution allows for easy installation and tight integration with AXIS Camera Station (ACS). With an intuitive user interface, ACS provides all the necessary features for effective surveillance. It features efficient search capabilities, so it’s quick and easy to review and search for incidents. This cost-effective solution also offers tight integration with other Axis products. For instance, you can expand your security system and set up triggers to activate speakers or lights.

It also offers easy integration with your video management software (VMS). And, the application’s open API (application programming interface) lets you add tailor-made applications for more complex requirements. Furthermore, redundant DC power and PoE help ensure a reliable power supply.

Additional information

Product Type

Network Camera

Remote Management

Yes

Product Name

P1455-LE-3 License Plate Verifier Kit

Product Series

P14

Marketing Information

AXIS P1455-LE-3 includes an HDTV 1080p fixed bullet camera and comes with AXIS License Plate Verifier preinstalled. Featuring freeflow mode, it's ideal for use in slow-speed traffic, such as in city centers, gated communities, and campuses. The compact and robust IK10-rated camera includes shock detection for installation in all environments. Featuring a 29 mm telephoto lens, this cost-effective solution can read license plates from 7 to 20 meters (20-65 feet). It includes Axis image enhancement technologies as well as Optimized IR – to ensure sharp images for license plate reading 24/7. Furthermore, it offers tight integration with AXIS Camera Station. This all-in-one, outdoor camera kit includes an HDTV 1080p fixed bullet camera and comes with AXIS License Plate Verifier preinstalled. It offers an easy, cost-effective kit and includes freeflow mode for slow-speed traffic areas. All-in-one license plate reading AXIS P1455-LE-3 License Plate Verifier kit is ideal for slow-speed traffic, such as in city centers, access roads, gated communities, and campuses. It consists of an Axis fixed bullet camera and preinstalled AXIS License Plate Verifier analytics. Featuring a 29 mm telephoto lens, it delivers a high pixel density to allow for sharp license plates reading from 7 to 20 meters (20-65 feet). This cost-effective solution delivers HDTV 1080p resolution and features automatic focus setting to ensure the desired field of view in perfect focus. Any weather, any time This robust and compact IK10-rated camera can be installed in all environments. It includes a weathershield and can handle temperatures ranging from -40 °C to 60 °C (-40 °F to 140 °F). Featuring shock detection, the camera will send an alarm when it has been hit. And, electronic image stabilization (EIS) ensures stable video despite vibration. This all-in-one, outdoor camera kit includes Axis image enhancement technologies as well as OptimizedIR to ensure sharp images for license plate reading around the clock. Easy and efficient This flexible, all-in-one solution allows for easy installation and tight integration with AXIS Camera Station (ACS). With an intuitive user interface, ACS provides all the necessary features for effective surveillance. It features efficient search capabilities, so it's quick and easy to review and search for incidents. This cost-effective solution also offers tight integration with other Axis products. For instance, you can expand your security system and set up triggers to activate speakers or lights. It also offers easy integration with your video management software (VMS). And, the application's open API (application programming interface) lets you add tailor-made applications for more complex requirements. Furthermore, redundant DC power and PoE help ensure a reliable power supply.

Lens Type

Varifocal

Maximum Aperture

f/1.7

Minimum Aperture

f/1.7

Lens Included

Yes

Features

PTZ

Country of Origin

Poland

NDAA Compliant

Yes

Weight (Approximate)

2.65 lb

Manufacturer

Axis Communications

Mount Type

Conduit Mount

Diameter

5.2"

Height

10.4"

Width

5.2"

Input Voltage

12 V DC

Storage Type

Memory Card

Recording Formats

HD

HD Recording

Yes

Night Vision Distance

147.64 ft

Video Formats

H.264

Product Model

P1455-LE-3

Manufacturer Website Address

http://www.axis.com

Color Supported

Color

Network (RJ-45)

Yes

Connectivity Technology

Wired

Form Factor

Dome

Optical Zoom

2.6x

Brand Name

AXIS

Maximum Video Resolution

1920 x 1080

Maximum Focal Length

29 mm

Minimum Focal Length

10.90 mm

Image Sensor Type

RGB CMOS

Minimum Operating Temperature

-40°F (-40°C)

Maximum Operating Temperature

140°F (60°C)

Night Vision

Yes

Manufacturer Part Number

02235-001

Product Family

P14

TAA Compliant

Yes

Indoor/Outdoor

Outdoor

Operating Humidity

100%

Product Color

Semi-white

Impact Protection Rating

IK10

Ingress Protection Rating

IP67

Effective Camera Resolution

2 Megapixel

Field of View

Horizontal field of view 29°-11° Vertical field of view 17°-6.5°

Longest Shutter Speed

2 Second

Shortest Shutter Speed

1/66500 Second

Maximum Frame Rate

60 fps

Shopping cart

0
image/svg+xml

No products in the cart.

Continue Shopping