Free Shipping
Free Returns
Easy Payments
Sign up For our Blog
Trade in Welcome
Buy or Lease
Previous
Previous Product Image

Q9216-SLV WHITE *CONSTRAINED-EXTENDED LEAD TIMES

$1,146.60
Next

Q1715 BLOCK CAMERA

$1,202.12
Next Product Image

P3245-LVE-3 LICS PLATE VERIFIER KIT *CONSTRAINED-LONG LEAD TIMES

$1,192.87

AXIS 02234-001 2 Megapixel HD Network Camera – Dome – TAA Compliant – 49.21 ft – H.264 (MPEG-4 Part 10/AVC), H.265 (MPEG-H Part 2/HEVC), MJPEG, H.264, H.265 – 1920 x 1080 – 3.40 mm Varifocal Lens – 2.6x Optical – RGB CMOS – Junction Box Mount, Wall Mount, Ceiling Mount, Bracket Mount, Recessed Mount, Pendant Mount – Vandal Resistant, Weather Resistant, Impact Resistant

SKU: 02234-001 Brand: Axis Communications Condition: New UPC: 7331021075153 Categories: , ,

Description

AXIS 02234-001 2 Megapixel HD Network Camera – Dome – TAA Compliant – 49.21 ft – H.264 (MPEG-4 Part 10/AVC), H.265 (MPEG-H Part 2/HEVC), MJPEG, H.264, H.265 – 1920 x 1080 – 3.40 mm Varifocal Lens – 2.6x Optical – RGB CMOS – Junction Box Mount, Wall Mount, Ceiling Mount, Bracket Mount, Recessed Mount, Pendant Mount – Vandal Resistant, Weather Resistant, Impact ResistantAXIS P3245-LVE-3 includes an HDTV 1080p fixed dome camera and comes with AXIS License Plate Verifier preinstalled. This easy-to-install kit verifies license plates against a list of authorized or unauthorized number plates stored in the camera. Processing and storage take place in the camera, so there’s no need for expensive servers, and bandwidth requirements are reduced. This vandal-resistant camera includes shock detection, so it’s safe to use even when installed at lower, more accessible heights. And Axis OptimizedIR ensures the ideal image settings for license plate reading 24/7. Furthermore, it offers integration with video management systems (VMS) for complex requirements.

Additional information

Product Type

Network Camera

Remote Management

Yes

Product Name

P3245-LVE-3 License Plate Verifier Kit

Product Series

P32

Marketing Information

AXIS P3245-LVE-3 includes an HDTV 1080p fixed dome camera and comes with AXIS License Plate Verifier preinstalled. This easy-to-install kit verifies license plates against a list of authorized or unauthorized number plates stored in the camera. Processing and storage take place in the camera, so there's no need for expensive servers, and bandwidth requirements are reduced. This vandal-resistant camera includes shock detection, so it's safe to use even when installed at lower, more accessible heights. And Axis OptimizedIR ensures the ideal image settings for license plate reading 24/7. Furthermore, it offers integration with video management systems (VMS) for complex requirements.

Lens Type

Varifocal

Maximum Aperture

f/1.8

Lens Included

Yes

Features

Audio Detection

Country of Origin

Poland

NDAA Compliant

Yes

Weight (Approximate)

1.80 lb

Manufacturer

Axis Communications

Durability

Weather Resistant

Mount Type

Pendant Mount

Diameter

5.9"

Height

4.1"

Storage Type

Memory Card

Recording Formats

HD

HD Recording

Yes

Night Vision Distance

49.21 ft

Video Formats

H.265

Product Model

02234-001

Manufacturer Website Address

http://www.axis.com

Color Supported

Color

Maximum Operating Temperature

122°F (50°C)

Connectivity Technology

Wired

Form Factor

Dome

Optical Zoom

2.6x

Brand Name

AXIS

Maximum Video Resolution

1920 x 1080

Maximum Focal Length

8.90 mm

Minimum Focal Length

3.40 mm

Image Sensor Type

RGB CMOS

Minimum Operating Temperature

-40°F (-40°C)

Network (RJ-45)

Yes

Manufacturer Part Number

02234-001

Product Family

P32

TAA Compliant

Yes

Operating Humidity

100%

Product Color

Semi-white

Impact Protection Rating

IK10

Ingress Protection Rating

IP66

Effective Camera Resolution

2 Megapixel

Field of View

Horizontal field of view: 100°-36° Vertical field of view: 53°-20°

Longest Shutter Speed

2 Second

Shortest Shutter Speed

1/66500 Second

Maximum Frame Rate

60 fps

Shopping cart

0
image/svg+xml

No products in the cart.

Continue Shopping