Free Shipping
Free Returns
Easy Payments
Sign up For our Blog
Trade in Welcome
Buy or Lease
Previous
Previous Product Image

P3247-LVE (EOL)

$831.95
Next

P1245 *CONSTRAINED-EXTENDED LEAD TIMES

$341.48
Next Product Image

P3719-PLE NTWK CAMERA 15MP 4XQUAD HD *CONSTRAINED-LONG LEADS

$1,572.29

AXIS P3719-PLE 15 Megapixel Outdoor Network Camera – Color – Dome – TAA Compliant – 49.21 ft Infrared Night Vision – H.265 (MPEG-H Part 2), H.264 (MPEG-4 Part 10/AVC), H.265, H.264, H.264 (MP), H.264 HP – 2560 x 1440 – 3 mm- 6 mm Varifocal Lens – 2x Optical – RGB CMOS – Corner Mount, Pole Mount, Parapet Mount, Pendant Mount, Conduit Mount, Ceiling Mount, Wall Mount, Recessed Mount, Backbox Mount, Bracket Mount, Junction Box Mount, … – IK09 – IP66, IP67 – Impact Resistant, Weather Resistan

SKU: 01500-001 Brand: Axis Communications Condition: New UPC: 7331021064126 Categories: , ,

Description

AXIS P3719-PLE 15 Megapixel Outdoor Network Camera – Color – Dome – TAA Compliant – 49.21 ft Infrared Night Vision – H.265 (MPEG-H Part 2), H.264 (MPEG-4 Part 10/AVC), H.265, H.264, H.264 (MP), H.264 HP – 2560 x 1440 – 3 mm- 6 mm Varifocal Lens – 2x Optical – RGB CMOS – Corner Mount, Pole Mount, Parapet Mount, Pendant Mount, Conduit Mount, Ceiling Mount, Wall Mount, Recessed Mount, Backbox Mount, Bracket Mount, Junction Box Mount, … – IK09 – IP66, IP67 – Impact Resistant, Weather Resistan

AXIS P3719-PLE lets you easily cover four different areas with a single camera, around the clock and even in challenging lighting. You’ll be able to count on both excellent overviews and detailed coverage thanks to the brilliant design of this cost-effective solution. It’s ideal for unobstructed and far-reaching surveillance of expansive outdoor areas, road intersections and at outer corners of buildings.

Four cameras for the price of one

With AXIS P3719-PLE, you get the benefits of four cameras, while paying for just one. That means there’s one camera to install, one cable to draw, and one IP address, one video management software (VMS) license and just one license for any analytics you choose to install.

AXIS P3719-PLE also offers remote zoom and focus for fast, accurate installation. It can be powered by PoE allowing you to use existing cabling, further reducing costs. Plus, Axis Zipstream technology for savings of up to 50% on bandwidth and storage. The bottom line? AXIS P3719-PLE will save you money on both initial installation and long-term operations.

Wide areas and great images – day and night

AXIS P3719-PLE offers four channels with Quad HD resolution per channel, at a frame rate of 30 fps. It features WDR for clarity when there are both dark and light areas in the scene.

AXIS P3719-PLE has 360° IR illumination with individually controllable LEDs and an automatic IR cut filter. So you’ll enjoy clear, reflection-free footage in low light or complete darkness and undistorted color during the day. Plus, it’s weather resistant thanks to an integrated weathershield with an IP66/IP67 rating.

One camera for the coverage of four

The beauty of AXIS P3719-PLE lies in its design, with four varifocal camera heads that can be moved and rotated to capture scenes in various directions in wide or zoomed-in views. AXIS P3719-PLE delivers a 360° overview or a combination of overviews and close-ups depending on your needs. In addition, the camera’s sensors can be twisted, allowing two camera heads to be positioned closer together, so one can take the wide view and the other can zoom in on the same target.

The camera can be mounted on corners of buildings or on poles and parapets using AXIS T94N01D Pendant Kit. When corner-mounted, AXIS P3719-PLE provides 270° coverage using 3 camera heads, while the fourth camera captures the scene right below the camera – avoiding blind spots.

Additional information

Product Type

Network Camera

Features

White Balance

Manufacturer

Axis Communications

Product Model

P3719-PLE

Product Name

P3719-PLE Network Camera

Product Series

P37

Marketing Information

AXIS P3719-PLE lets you easily cover four different areas with a single camera, around the clock and even in challenging lighting. You'll be able to count on both excellent overviews and detailed coverage thanks to the brilliant design of this cost-effective solution. It's ideal for unobstructed and far-reaching surveillance of expansive outdoor areas, road intersections and at outer corners of buildings. Four cameras for the price of one With AXIS P3719-PLE, you get the benefits of four cameras, while paying for just one. That means there's one camera to install, one cable to draw, and one IP address, one video management software (VMS) license and just one license for any analytics you choose to install. AXIS P3719-PLE also offers remote zoom and focus for fast, accurate installation. It can be powered by PoE allowing you to use existing cabling, further reducing costs. Plus, Axis Zipstream technology for savings of up to 50% on bandwidth and storage. The bottom line? AXIS P3719-PLE will save you money on both initial installation and long-term operations. Wide areas and great images – day and night AXIS P3719-PLE offers four channels with Quad HD resolution per channel, at a frame rate of 30 fps. It features WDR for clarity when there are both dark and light areas in the scene. AXIS P3719-PLE has 360° IR illumination with individually controllable LEDs and an automatic IR cut filter. So you'll enjoy clear, reflection-free footage in low light or complete darkness and undistorted color during the day. Plus, it's weather resistant thanks to an integrated weathershield with an IP66/IP67 rating. One camera for the coverage of four The beauty of AXIS P3719-PLE lies in its design, with four varifocal camera heads that can be moved and rotated to capture scenes in various directions in wide or zoomed-in views. AXIS P3719-PLE delivers a 360° overview or a combination of overviews and close-ups depending on your needs. In addition, the camera's sensors can be twisted, allowing two camera heads to be positioned closer together, so one can take the wide view and the other can zoom in on the same target. The camera can be mounted on corners of buildings or on poles and parapets using AXIS T94N01D Pendant Kit. When corner-mounted, AXIS P3719-PLE provides 270° coverage using 3 camera heads, while the fourth camera captures the scene right below the camera – avoiding blind spots.

Lens Type

Varifocal

Maximum Aperture

f/1.8

Minimum Aperture

f/2.6

Lens Included

Yes

Package Contents

P3719-PLE Network Camera RJ45 Mounting Tool Screw Bit TR20 Installation Guide Windows Decoder 1-user License

NDAA Compliant

Yes

Manufacturer Part Number

01500-001

Remote Management

Yes

Weight (Approximate)

4.41 lb

Durability

Weather Resistant

Mount Type

Backbox Mount

Diameter

10"

Height

3.6"

Storage Type

Memory Card

HD Recording

Yes

Night Vision Distance

49.21 ft

Video Formats

H.265 (MPEG-H Part 2)

Manufacturer Website Address

http://www.axis.com

Shortest Shutter Speed

1/66500 Second

Color Supported

Color

Network (RJ-45)

Yes

Connectivity Technology

Wired

Form Factor

Dome

Optical Zoom

2x

Brand Name

AXIS

Maximum Video Resolution

2560 x 1440

Maximum Focal Length

6 mm

Minimum Focal Length

3 mm

Image Sensor Type

RGB CMOS

Minimum Operating Temperature

-22°F (-30°C)

Maximum Operating Temperature

122°F (50°C)

Night Vision

Yes

Longest Shutter Speed

1/5 Second

Product Family

P37

TAA Compliant

Yes

Indoor/Outdoor

Outdoor

Operating Humidity

100%

Product Color

White

Impact Protection Rating

IK09

Ingress Protection Rating

IP67

Night Vision Type

Infrared

Effective Camera Resolution

15 Megapixel

Field of View

Horizontal field of view: 101°-49° – Vertical field of view: 54°-29° – Diagonal field of view: 116°-58°

Maximum Frame Rate

30 fps

Shopping cart

0
image/svg+xml

No products in the cart.

Continue Shopping