Previous
Previous Product Image

SDS 1031-13 PTT UNAMPLIFIED DUAL CHANNEL

$335.98
Next

SHR2638-01 SUPRA BINUARAL BTO NO RETURNS LONG LEAD TIME

$245.94
Next Product Image

RUGGEDISED BINAURAL HEADSET BTO NO RETURNS LONG LEAD TIME

$347.77

Plantronics SHR 2460-01 Headset – Stereo – Wired – Over-the-head – Binaural – Circumaural – 2.50 ft Cable – Noise Canceling

SKU: 92460-01 UPC: 0017229152168 Brand: Plantronic Condition: New Categories: , ,

Description

Plantronics SHR 2460-01 Headset – Stereo – Wired – Over-the-head – Binaural – Circumaural – 2.50 ft Cable – Noise CancelingThe Plantronics Ruggedized Dynamic Headset leverages our proven circumaural design to provide optimum performance in high noise applications. The dynamic, noise-canceling microphones enable clear, uninterrupted communications in mission critical applications. Cable, connector, and PTT options are available upon request. The SHR 2460-01 features a 30-inch cable terminated in a TA6M Quick-Disconnect.

Additional information

Cable Length

2.50 ft

Manufacturer Website Address

http://www.poly.com

Environmental Certification

RoHS

Environmentally Friendly

Yes

Country of Origin

Mexico

Marketing Information

The Plantronics Ruggedized Dynamic Headset leverages our proven circumaural design to provide optimum performance in high noise applications. The dynamic, noise-canceling microphones enable clear, uninterrupted communications in mission critical applications. Cable, connector, and PTT options are available upon request. The SHR 2460-01 features a 30-inch cable terminated in a TA6M Quick-Disconnect.

Product Name

SHR 2460-01 Headset

Product Model

SHR 2460-01

Manufacturer

Poly

Manufacturer Part Number

92460-01

Product Type

Headset

Noise Canceling

Yes

Microphone Design

Boom

Earpiece Type

Binaural

Earpiece Design

Over-the-head

Brand Name

Plantronics

Form Factor

Circumaural

Connectivity Technology

Wired

Sound Mode

Stereo

Features

Quick Disconnect

0
    0
    Your Cart
    Your cart is emptyReturn to Shop