Free Shipping
Free Returns
Easy Payments
Sign up For our Blog
Trade in Welcome
Buy or Lease
Previous
Previous Product Image

SHR2638-01 SUPRA BINUARAL BTO NO RETURNS LONG LEAD TIME

$245.94
Next

SDS1031-15 SUPRA PLUS HS BTO NO RETURNS/NO GOV DISC/LG LEAD TIME

$335.98
Next Product Image

SHR2639-01 RUGGED CIRCUMAURAL BTO NO RETURNS LONG LEAD TIME

$296.86

Plantronics SHR 2639-01 Headset – Stereo – Wired – Over-the-head – Binaural – Circumaural

SKU: 92639-01 Brand: Plantronic Condition: New UPC: 0017229138384 Categories: , ,

Description

Plantronics SHR 2639-01 Headset – Stereo – Wired – Over-the-head – Binaural – CircumauralThe SHR 2639-01 is a Premium Circumaural headset Designed for use with Plantronics Dual-Channel Adapters.

Additional information

Product Type

Headset

Manufacturer

Poly

Width

4.7"

Height

9"

Weight (Approximate)

1.14 lb

Country of Origin

United States

Marketing Information

The SHR 2639-01 is a Premium Circumaural headset Designed for use with Plantronics Dual-Channel Adapters.

Product Name

SHR 2639-01 Headset

Product Model

SHR 2639-01

Packaged Quantity

1

Sound Mode

Stereo

Manufacturer Website Address

http://www.poly.com

Manufacturer Part Number

92639-01

Microphone Design

Boom

Earpiece Type

Binaural

Earpiece Design

Over-the-head

Brand Name

Plantronics

Form Factor

Circumaural

Connectivity Technology

Wired

Features

Adjustable Headband

Shopping cart

0
image/svg+xml

No products in the cart.

Continue Shopping