Previous
Previous Product Image

SHR 2083-01 RUGGEDIZED BINAURAL BTO NO RETURNS LONG LEAD TIME

$206.73
Next

SDS 1031-13 PTT UNAMPLIFIED DUAL CHANNEL

$335.98
Next Product Image

SMH1783-15 H251N-M22 BINAURAL W BTO NO RETURNS LONG LEAD TIME

$219.62

Plantronics Supra H61 Voice Tube Headset – Wired Connectivity – Stereo – Over-the-head

SKU: 91783-15 UPC: 0017229133235 Brand: Plantronic Condition: New Categories: , ,

Description

Plantronics Supra H61 Voice Tube Headset – Wired Connectivity – Stereo – Over-the-head

The most popular headset in the world, the Supra owes its popularity to the perfect balance between light weight, superior sound and outstanding comfort. The dual earpieces have a yoked double cable, which gives greater clarity by providing sound in both ears. The superior voice tube technology makes speaking a real pleasure.

Additional information

Host Interface

Proprietary

Manufacturer Part Number

91783-15

Weight (Approximate)

2.08 oz

Marketing Information

The most popular headset in the world, the Supra owes its popularity to the perfect balance between light weight, superior sound and outstanding comfort. The dual earpieces have a yoked double cable, which gives greater clarity by providing sound in both ears. The superior voice tube technology makes speaking a real pleasure.

Product Line

Supra

Product Name

Supra H61 Voice Tube Headset

Product Model

H61

Manufacturer

Poly

Manufacturer Website Address

http://www.poly.com

Product Family

Supra

Cable Length

10 ft

Microphone Design

Boom

Earpiece Type

Binaural

Earpiece Design

Over-the-head

Brand Name

Plantronics

Form Factor

Supra-aural

Connectivity Technology

Wired

Sound Mode

Stereo

Product Type

Headset

Features

Lightweight

0
    0
    Your Cart
    Your cart is emptyReturn to Shop