Description
Plantronics SHR 2460-01 Headset – Stereo – Wired – Over-the-head – Binaural – Circumaural – 2.50 ft Cable – Noise CancelingThe Plantronics Ruggedized Dynamic Headset leverages our proven circumaural design to provide optimum performance in high noise applications. The dynamic, noise-canceling microphones enable clear, uninterrupted communications in mission critical applications. Cable, connector, and PTT options are available upon request. The SHR 2460-01 features a 30-inch cable terminated in a TA6M Quick-Disconnect.